Lifting Inspection Checklist | Lifting checklist
S/N |
LIFTING ITMS CHECKS |
Y |
N |
N/A |
REMARKS |
1 |
Approved lifting RA and MS are in place. |
|
|
|
|
2 |
Equipment’s 3rd party inspection certificates are available. |
|
|
|
|
3 |
Lifting gears 3rd party inspection certificates are available. |
|
|
|
|
4 |
Crane operator 3rd party inspection certificates and license available. |
|
|
|
|
5 |
Rigger competency check and 3rd party certificate available. |
|
|
|
|
6 |
Approved Lifting plans are in place and signed by Riggers. |
|
|
|
|
7 |
The rigging Supervisor is available on-site. |
|
|
|
|
8 |
Vehicle/crane/ boom truck daily inspection sheet in place. |
|
|
|
|
9 |
A competent supervisor was present for the unloading / lifting operation. |
|
|
|
|
10 |
During lifting operation – tools in available (cones, warning tapes, plastic chain). |
|
|
|
|
11 |
Lifting activity warning signs are available. |
|
|
|
|
12 |
Outrigger pads are available and manufactured as per standards, size is suitable for the equipment. |
|
|
|
|
13 |
Inspection of lifting gears (chains, hook, shackles, rope, anti 2 block, webbing straps, etc., color-coded and free of damage and cuts). |
|
|
|
|
14 |
Manufacturer handbook/ Manual present with the equipment. |
|
|
|
|
15 |
Load chart present on cranes and HIABs or Boom trucks. |
|
|
|
|
16 |
SWL chart is posted and fit to use. |
|
|
|
|
17 |
The outrigger was well maintained without any signs of leakage or hydraulic failure. |
|
|
|
|
18 |
Lifting is performed away from overhead cables and near excavations. |
|
|
|
|
19 |
Soil condition is suitable to perform the lift. |
|
|
|
|
20 |
Use load- the tagline is used to control the load. |
|
|
|
|
0 Comments