LEAN CONCRETE WORK HAZARDS AND CONTROL MEASURES
Lean Concrete hazards and control measuresLean concrete work
HAZARDS |
CONTROL MEASURES |
· Improper access / agrees · Concrete (Cement chemical) · Improper PPEs
|
- Material storage is to be identified and staked safely. - The transit mixer machine shall be escorted by a banks man in the excavation area during lean concrete. - Open pits to be hard barricaded - The transit mixer machine shall be parked away from the edge of the excavation - Barricaded area - Wear appropriate PPE (Face shield, Gumboot, rubber gloves, glasses, dust musk, etc. - All equipment shall be inspected on daily basis. - The concrete pump is to be kept at a safe distance from the location while pouring the concrete - Full body harness shall be worn above 1.8 M height - Follow MSDS of cement for chemical handling, MSDS safety instructions, and a safe system of work - The eye was station available at the work site or fresh drinking water for eye wash - Under the Workplace Hazardous Materials Information System (WHMIS) in force workers handling, using, or exposed to dry or wet cement must be educated in hazards and controls - Mix dry cement in well-ventilated areas - Clothing contaminated by wet cement should be quickly removed. - Skin in contact with wet cement should be washed immediately with - large amounts of cool clean water - Contaminated eyes should be washed with cold tap water for at least 15 minutes before the affected person is taken to the hospital - Coveralls with long sleeves and full-length trousers, Waterproof boots high enough to prevent concrete from flowing in when workers must stand in fresh concrete - First Aider and first aid medicine kits are available at the site. -
Safety signs shall be provided |
0 Comments