Excavation hazards and Control measures | Mechanical and Manual excavation work hazards
![]() |
Excavation hazards and controls |
MECHANICAL / MANUAL
EXCAVATION WORK- HAZARDS AND CONTROL MEASURES
HAZARDS |
CONTROL MEASURES |
· Equipment failure ( Excavator, Loader, Dumper) · U/G existing services (FOC) · Improper Access / Egress · Vehicle movement (Excavator, Loader, Dumper) / hit to workers · Excavation /Cave-in / Excavation collapse · Slip, Trip, Fall ·
Dust |
- Daily pre-work start inspection shall be carried out by the operator and certified by the area foreman. - Ensure all equipment & tools are inspected by a trained person - Operators & drivers have a valid driving license - Follow daily / weekly checklist for equipment & tools. - All identified underground utilities as per on Existing As-Built Drawing issued from the Client/Consultant shall be marked. - A cable Detector shall be used before manual digging to locate underground utilities such as electrical cables. - Trial pit Excavation permit shall have been obtained before work commencement (if required trial pit for underground services) - Trial Pits will be carried out manually to expose and identify all underground services. - Only hand shovel and pick axe will be used for trail pit manual excavation - No machinery is allowed to excavate Trial Pit under any circumstances - All existing services will be covered, supported, and protected following the related authorities’ instructions in the NOC. - Identify and secure all existing structures which will be affected by excavation works - Check and ensure the area of work is free from hazardous - Report immediately for the identified utility or underground services. - Make proper steps access for pedestrian workers in the excavation - Make proper slope access for vehicle movement in the excavation area - Only approved aluminum ladders are to be used as means of access and egress in the trench of excavation - Make separate access for vehicle movement away from the pedestrian access. - Deploy banks man/ Flagman to control the movement of the vehicles, equipment - Banks man wearing a reflective jacket to be provided - No one worker working nearby the excavator - The Excavator operator shall be trained & experienced - Auto alarm system in excavator during moving of boom - Always moving up position boom of the excavator - Make separate access for vehicle movement away from the pedestrian access. - Proper barricading shall be placed and Traffic control, Caution, and Awareness signboards shall be placed for each excavation area - Flashlights shall provide for the barricading for ease of identification during the night times - Personal Protective Equipment (PPE) will be provided (i.e. Safety Shoes, Coverall, Safety Helmet, and Reflective vest. - All vehicles have shall reverse alarm and revolving warning light. - The excavation area should be marked as per as building drawing - Barricade the area with adequate barriers and place safety sign boards - Excavated material shall be kept a minimum of 2 meters, Away from the edge of the trench - The trench shall be kept safe and stabilized by providing sloping/benching - All excavation works will be supervised by a competent supervisor. - Proper housekeeping will be maintained on-site at all times to ensure that all pathways and edges of excavation are clear of any potential falling objects or obstructions. - Proper housekeeping will be maintained on-site at all times to ensure that all pathways and edges of excavation are clear of any potential falling objects or obstructions. - The area Should be clean and tidy - Tools and equipment do not keep or stacked on the access /egress - Barricaded area - Display safety signage - Use a dust mask - Water showering and avoid dust |
0 Comments